Installation
|
|
We'll keep you informed. When your job goes into production, you will be notified as to the approximate date of installation. Then, approximately one week prior to that date, we will call to arrange a specific installation schedule convenient for you.
Our installers are top-notch technicians. Using the right tools, verifying the conditions before they start, and keeping your establishment neat and clean is the final phase of your successful awning job.
One way in which our installers verify the conditions is to determine what type of anchoring methods will be used on your job. The choice of an anchoring system will depend on the construction of your building. Whether your building is brick, wood, concrete, steel, stucco, or another material, Austin will determine the best method of attaching your awnings to your structure.

Four things taken into consideration when determining the best anchoring system for your structure are:
- Amount and direction of loads imposed on the frame.
- Location of the anchors.
- Reaction loads at the anchors.
- Details and material of the parent structure.
This is just one area where our experienced installation professionals excel at delivering a finished product that will exceed your expectations.

|
|